Hello and thank you for your help,
I have a quandary that I cannot find an answer to and am hoping that the forums will be able to help. Here is an example which does not exactly match my situation but is close enough to demonstrate my problem:
I have a site that controls several pieces of equipment on a factory floor with only 1 operator for all the machines in a given area. The operator has 3 different thin clients that they can use to control the equipment in the area. Only 1 of the 3 stations can be actively controlling equipment at any time. I have the process of control switching down fine where if station 2 has control, station 1 and station 3 cannot activate the equipment until station 2 releases control. What I cannot seem to do is this:
When a new station takes control of the machines, I need to open a blank screen on the other 2 stations that has a default message 'control is at another station' or something to that effect. Is it possible to open a screen on the other 2 stations automatically (or forced) when the 3rd station properly verifies and takes control of the machinery?
Thanks for your help and please let me know if you need more information.
(edited for grammar and clarity)