Please delete, this should be in the design. I have made a new thread there.
Thanks
Ben
Sorry if this has been asked before, I did search but didnt find what I was looking for.
Im string to set the point at where the ISO should start. I have a pipe that has several sheets but the first sheet is a branch of of the main line, about midway though the main flow. Another way of putting it its starting at the head of B2 rather than the head of B1.
Hierarchic has B1 is before B2. Anyway to force so the first sheet shows has the B1 head?
Thanks
Please delete, this should be in the design. I have made a new thread there.
Thanks
Ben
Sorry if this has been asked before, I did search but didnt find what I was looking for.
Im string to set the point at where the ISO should start. I have a pipe that has several sheets but the first sheet is a branch of of the main line, about midway though the main flow. Another way of putting it its starting at the head of B2 rather than the head of B1.
Hierarchic has B1 is before B2. Anyway to force so the first sheet shows has the B1 head?
Thanks