Translucency from PDMS to Navisworks

 
Parents
  • Option 1 is impractical for us. The insulation on the pipe, already modeled, is being added by several designers, all day. Revew models are required 3 or 4 times a day. How can we keep up with which pipes are insulated, which each subsequent review?
    Option 2 requres a UDA. Some branches of a pipe might not be insulated. A UDA at site or zone would show everything as insulated. What happens on personnel protection, when only a portion of the line is insulated?
    Thanks
    Allan
Reply
  • Option 1 is impractical for us. The insulation on the pipe, already modeled, is being added by several designers, all day. Revew models are required 3 or 4 times a day. How can we keep up with which pipes are insulated, which each subsequent review?
    Option 2 requres a UDA. Some branches of a pipe might not be insulated. A UDA at site or zone would show everything as insulated. What happens on personnel protection, when only a portion of the line is insulated?
    Thanks
    Allan
Children
No Data