Parents
  • Hi Guys,

    I would like to pick your brains regarding this one, I would like to know the detailed processes this command does.
    or what is done by the Update event created.

    As I am having a problem with the setup here, only 1 hour of global connection per project 3 times a day, which is obviously not enough to do all the updates which Update event or UPDATE ALL WITH SAT does.

    I would like to develop a tool implemented through PML that will mimic the operation of Update event but will choose which database to update basing on the latest modified DB file.

    I hope anybody can point me in the right direction.


    Cheers,
    Edgar
Reply
  • Hi Guys,

    I would like to pick your brains regarding this one, I would like to know the detailed processes this command does.
    or what is done by the Update event created.

    As I am having a problem with the setup here, only 1 hour of global connection per project 3 times a day, which is obviously not enough to do all the updates which Update event or UPDATE ALL WITH SAT does.

    I would like to develop a tool implemented through PML that will mimic the operation of Update event but will choose which database to update basing on the latest modified DB file.

    I hope anybody can point me in the right direction.


    Cheers,
    Edgar
Children
No Data